Project photographA solar site, viewed through complementary studies.
The Manah 1 record brings together UAV infrared module testing, Industrial UAV topographic survey and a post-construction hydrological study.
Explore the assignmentExamine Marmol’s technical contribution across energy assets, transport corridors and geospatial sites. Each assignment connects the engineering context with the recorded scope and available evidence.
Explore the project register
Project photographThe Manah 1 record brings together UAV infrared module testing, Industrial UAV topographic survey and a post-construction hydrological study.
Explore the assignment
Project photographAt Seih Qatnah, Marmol’s record covers geological survey, mapping and the design of protection systems. Its published update shows the protection works on site.
Explore the assignment
Site context photographThe Hasik–Ash Shuwaymiyah road provides the setting; Marmol's listed assignment is soil stabilisation and rockfall protection.
Explore the assignment
Site context photographAt Wadi Dawkah, Marmol's documented consultancy work covers a Industrial UAV topographic survey of the selected area and on-site marking of plot boundaries.
Explore the assignment
Project photographTopographic survey, slope stability analysis and slope protection works.
Explore the assignment
Project photographMarmol describes its contribution to slope stabilization on the Al Ansab–Al Jifnain Road Dualisation Project and acknowledges Muscat Municipality and Galfar. The original post’s construction milestone is historical, not a live progress indicator.
Explore the assignmentConnect the asset context with the recorded engineering scope, project parties and supporting material.
Project register updated.
Ground conditions. Protection systems. Field delivery.
Topographic survey, slope stability analysis and slope protection works.
Explore the assignmentA slope engineering project retained from Marmol’s original sustainability portfolio.
Explore the assignmentA slope engineering project retained from Marmol’s original sustainability portfolio.
Explore the assignmentErosion control implementation, including rock bolt installation and a reinforced drapery system.
Explore the assignmentGeological survey, mapping of geological structures and design of slope protection systems.
Explore the assignmentMarmol describes its contribution to slope stabilization on the Al Ansab–Al Jifnain Road Dualisation Project and acknowledges Muscat Municipality and Galfar. The original post’s construction milestone is historical, not a live progress indicator.
Explore the assignmentGeological survey and mapping, Industrial UAV topographic survey, slope stability analysis and design of slope protection systems.
Explore the assignmentGeophysical and geotechnical investigation with survey.
Explore the assignmentMountain risk assessment and condition evaluation study.
Explore the assignmentMountain design and hydrological study, topographic survey and slope stability analysis.
Explore the assignmentGeomechanical characterization, visual mapping of exposed discontinuities and review of available geotechnical reports.
Explore the assignmentTopographic survey and slope stabilization for the station and pipeline.
Explore the assignmentTopographic survey, slope stabilization and application works.
Explore the assignmentSlope protection works.
Explore the assignmentSlope protection works and rehabilitation of the north and south roads.
Explore the assignmentSupply and application of slope protection systems.
Explore the assignmentReinforced wire netting stabilization and shotcrete protection, with geotechnical investigation, GPS and aerial surveys, geological mapping, data collection and post-processing.
Explore the assignmentSupply and application of wire netting protection and stabilization, rock bolts, anchors and reinforced shotcrete.
Explore the assignmentAnchor drilling works and pull-out testing.
Explore the assignmentSupply and installation of a rockfall barrier as part of fencing works.
Explore the assignmentSoil stabilization and rockfall protection.
Explore the assignmentSupply and application of ConstruckSlope Basic, Extreme and CemWrap erosion and slope protection systems, with a rockfall barrier.
Explore the assignmentSupply and application of the ConstruckSlope Plus system.
Explore the assignmentSupply and application of the ConstruckSlope Plus system.
Explore the assignmentSupply and application of shotcrete and blinding concrete, with supply and installation of drain pipes.
Explore the assignmentRock removal, cleaning and scaling works.
Explore the assignmentDesign, supply and application of a cut-slope erosion control system.
Explore the assignmentDesign, supply and application of an embankment erosion control system.
Explore the assignmentDesign, supply and application of an erosion control system.
Explore the assignmentDesign, supply and application of a slope erosion control system.
Explore the assignmentSupply and application of a Construck Slope system and berm protection as an alternative to riprap works.
Explore the assignmentSupply and application of ConstruckSlope Plus systems for mountain protection.
Explore the assignmentSlope protection and consolidation, rockfall barriers, cable netting with HEA panels, rock bolts and geosynthetic cementitious composite.
Explore the assignmentSlope stabilization and protection, shotcrete and rock bolt works.
Explore the assignmentSlope protection works.
Explore the assignmentSlope protection and consolidation works.
Explore the assignmentSlope protection and consolidation works.
Explore the assignmentSlope protection and consolidation works.
Explore the assignmentSlope protection.
Explore the assignmentSlope protection.
Explore the assignmentSoil stabilization and rockfall protection.
Explore the assignmentSoil stabilization and rockfall protection.
Explore the assignmentSlope protection and consolidation works.
Explore the assignmentSoil stabilization and rockfall protection.
Explore the assignmentSoil stabilization and rockfall protection.
Explore the assignmentSlope protection and consolidation works.
Explore the assignmentField capture. Asset inspection. Engineering context.
Industrial UAV topographic survey of the selected Wadi Dawkah area and on-site ground marking of plot boundaries.
Explore the assignmentIncluded in the Asset Integrity & Intelligence portfolio following the company’s confirmation of participation. The exact work package, deliverables and project results are being documented.
Official name to be confirmedExplore the assignmentUAV infrared testing of photovoltaic modules, recorded across multiple yearly entries.
Explore the assignmentUAV infrared testing of photovoltaic modules, Industrial UAV topographic survey and a post-construction hydrological study of the solar site.
Explore the assignmentUAV infrared testing of photovoltaic modules, with yearly entries for the Amin solar project.
Explore the assignmentIncluded in the Asset Integrity & Intelligence portfolio following the company’s confirmation of participation. The exact work package, deliverables and project results are being documented.
Explore the assignmentIncluded in the Asset Integrity & Intelligence portfolio following the company’s confirmation of participation. The exact work package, deliverables and project results are being documented.
Explore the assignmentIncluded in the Asset Integrity & Intelligence portfolio following the company’s confirmation of participation. The exact work package, deliverables and project results are being documented.
Official name to be confirmedExplore the assignmentIncluded in the Asset Integrity & Intelligence portfolio following the company’s confirmation of participation. The exact work package, deliverables and project results are being documented.
Explore the assignmentTopographic survey for the Riyah 1 wind plant.
Explore the assignmentTopographic survey for the Riyah 2 wind plant.
Explore the assignmentUAV infrared testing of photovoltaic modules.
Official name to be confirmedExplore the assignmentUAV infrared testing of photovoltaic modules and topographic survey.
Official name to be confirmedExplore the assignmentIndustrial UAV topographic survey of the photovoltaic site, hydrological study and meteorological study.
Explore the assignmentIndustrial UAV topographic survey of the battery energy storage site, hydrological study and meteorological study.
Explore the assignmentIndustrial UAV topographic survey of the battery energy storage site, hydrological study and meteorological study.
Explore the assignmentIndustrial UAV topographic survey of the wind site, hydrological study and meteorological study.
Official name to be confirmedExplore the assignmentUAV inspection of a transmission line for OETC, as recorded in the company project profile.
Explore the assignmentIndustrial UAV inspection of an operating flare tip at Abu Tubul Block 60, listed for Zeeco and OQ Exploration & Production.
Explore the assignmentIndustrial UAV inspection of an operating flare tip at Tayseer Gas Field, listed for Exterran in the company project profile.
Explore the assignmentUAV survey and inspection at OMIFCO in Sur, as recorded in the company project profile.
Explore the assignmentIndustrial UAV videography for EPC-3 subpackages A and C at the Duqm Refinery project, listed for Saipem and OQ8.